Sheet A-02 · Section

A section
through a project

Six layers, each with an artefact and a decision point. You can stop after any layer and keep everything produced.

  1. L1

    Survey

    Interviews, review of existing systems, list of entities and owners.

    Duration
    1–2 weeks
    Artefact
    Domain map, risk list
  2. L2

    Drawing

    Container architecture, consistency models, storage choices.

    Duration
    1–2 weeks
    Artefact
    C4 diagrams, ADRs, estimate
  3. L3

    Prototype

    Clickable prototype plus a technical spike on the riskiest part.

    Duration
    2–3 weeks
    Artefact
    Prototype, spike report
  4. L4

    Build

    Development with a demo after every sprint and consistency tests.

    Duration
    2-week sprints
    Artefact
    Builds, changelog
  5. L5

    Verification

    Load, fault tolerance, accessibility, security.

    Duration
    1–2 weeks
    Artefact
    Test protocol
  6. L6

    Handover

    Publishing, runbooks, training your team.

    Duration
    1 week
    Artefact
    Runbook, access, keys
Server rack in a data centre with network cables and hardware
Illustrative stock photo Not our team, equipment or project. Free High-tech server rack in a secure data center with network cables and hardware components. Stock Photo · Pexels License
Q

How we measure quality

DimensionCriterionHow we check
ConsistencyNo duplicates on retryTest with simulated network drop
RecoveryAgreed RPO and RTORehearsed restore from backup
AccessibilityWCAG 2.2 AAManual screen reader and keyboard pass
PerformanceAgreed response time budgetsLoad test with protocol